For those folks that didn’t have a chance to make it out to the field today, there were some notable accomplishments that took place:
- The first competitive event was held at the field (it was UAV/Drone racing, but not sponsored by the club)
- The first post-weather-related clean-up and rebuild happened, where the awning structures were rebuilt and the tarp coverings were used, then removed and stored to prevent further damage
- The first (maybe?) work done to the interior of the storage box, now with useful shelving inside
- The first cook-out / work party lunch took place for those who helped build, clean-up and fix all of the above
To commemorate all of this fine work, we snapped some new aerial photos showing the new layout as well as the temporary drone racing area. Check them out on the photo site.
We expect to see more of these work events as the weather improves to keep building out the field facilities. Check back for more details as they become available.
[peg-image src=”https://lh3.googleusercontent.com/-3Mfjf0Bt5vk/WOrgamHCujI/AAAAAAAAAg8/n5tzjOU-cRc7qjNTk4ASvd-MHwBh1cusgCCo/s144-o/DJI_0004.JPG” href=”https://picasaweb.google.com/109266140086726088486/6326264898486587137?locked=true#6407180167399258674″ caption=”” type=”image” alt=”DJI_0004.JPG” image_size=”4000×3000″ ]